Potential yearly per unit savings associated with increased capacity realized   after implementing SHOCKSystem™ in an economizer of 50 MW boiler.

Boilers: 50 MW | 100 MW | 200 MW | 300 MW
ECONOMIC BENEFITS: 100 MW BOILER (30 MW Increase in Capacity)
Benefit to Plant A Units
Savings Per Year
30 MW Increase in Capacity
30 MW * 8000 hrs/year * (55-25)$/MWh =
$7,200,000
4 Days/Year Reduction in Cleaning Outage
4*24 hrs/year * 300 MW * (55-25) $/MWh =
$864,000
Replacing 8 Air Sootblowers
8 * 5100 scfm * 0.0005 $/scf * 9 cycles/day * 6 minutes/cycle * 8000/24 days/year + (8 * 5000 $/year) =
$410,000
1.5" WC Decrease in Pressure Differential
Results in Reduction In Auxiliary Power Consumption of 544 KW
816 KW/1000 * 8000 hrs/year * 55 $/MWh =
$360,000
10 °F Decrease in Economizer Exit Gas Temperature
Results in Improvement in Net Plant Heat Rate of 12 BTU/KWh
12 BTU/KWh * (2.5/10^6) $/BTU * 822000 KW * 8000 hrs/year =
$200,000
Outage Cleaning Cost Reduction per Year
$50,000
Unit Start-Up Cost Reduction for One Cleaning Outage Event per Year
$50,000
Total Saving per Year
$9,134,000
ECONOMIC BENEFITS: 300 MW BOILER (15 MW Increase Capacity)
Benefit to Plant A Units
Savings Per Year
15 MW Increase in Capacity
15 MW * 8000 hrs/year * (55-25)$/MWh =
$3,600,000
4 Days/Year Reduction in Cleaning Outage
4*24 hrs/year * 300 MW * (55-25) $/MWh =
$864,000
Replacing 8 Air Sootblowers
8 * 5100 scfm * 0.0005 $/scf * 9 cycles/day * 6 minutes/cycle * 8000/24 days/year + (8 * 5000 $/year) =
$410,000
1.5" WC Decrease in Pressure Differential
Results in Reduction In Auxiliary Power Consumption of 544 KW
816 KW/1000 * 8000 hrs/year * 55 $/MWh =
$360,000
10 °F Decrease in Economizer Exit Gas Temperature
Results in Improvement in Net Plant Heat Rate of 12 BTU/KWh
12 BTU/KWh * (2.5/10^6) $/BTU * 822000 KW * 8000 hrs/year =
$200,000
Outage Cleaning Cost Reduction per Year
$50,000
Unit Start-Up Cost Reduction for One Cleaning Outage Event per Year
$50,000
Total Saving per Year
$5,534,000

Assumptions:
Capacity per Unit = 300 MW
Replacement Power Cost = $55/MWh
Cost to Produce Power = $25/MWh (Coal Cost = $ 2.5/mmBTU)
Hours of Operation/Year/Unit = 8000 Hours/Year
Cost to Clean a Economizer During an Outage = $ 50,000
Cost to Start-Up a Unit after an Outage= $ 50,000

Air Sootblower Data:
Sootblower Air Flow Rate = 5100 scfm (data from Clyde Bergemann website)
Air Usage Cost = 0.0005 $/scf (data from Clyde Bergemann website)
Cycles per Day = 9 Cycles /Day/Sootblower
Cycle Time = 6 Minutes/Cycle
Sootblower Maintenance Cost = $5,000/Sootblower/Year

* Note these are estimates and only suggest potential plant savings







 


Boiler Cleaning News

SHOCKSystem™ Receives Gold CQIA Designation
AEP Rockport Purchases Second SHOCKSystem™
EnergyTech: SHOCKSystem™ Reduces Erosion (PDF
Energy Central: Backpass Cleaning Comparison (PDF)
Power: Harnessing Detonation Waves (PDF)
EnergyTech: Advanced Sootblower Technologies (PDF)
Power: Shockingly Clean Boiler (PDF)
[ Boiler Cleaning News Archive ]
Shock Literature
<
White Paper: Tube Erosion
Detonation-Based Online Cleaning
Comparison: Acoustic Horn vs SHOCKSystem™
Comparison: Sootblower vs SHOCKSystem™
Meets Local, State and National Safety Regulations
[ Literature Archive ]
Shock Stories
<
Backpass Ash Platenization Removal
Economizer Demonstration
Economizer Demonstration
Economizer Demonstration
Economizer Bridging and Platenization Removal
[ Shock Stories Index ]
Pulse Detonation News

Popular Science: After Combustion - Detonation
Flight International: Pulse Power
Aviation Week: Taking the Pulse
[ Pulse Detonation News Archive ]

Span Shot of Shock tube exetending into boiler region with use of combustor bend.

[MPG : 498 KB]
Support hangers and combuster bends give the
shock-systems installation
flexibility.

[MPG : 563 KB]

Five-picture time-elapsed series
of ash removal in boiler region.

[5 pics]
The shockSystem blasts through all types of ash.

[5 Pics]


Manufacturer's Representitive
Opportunities.
If your company has an extensive knowledge of the coal-fired power generation industry. an exceptional record of successful representation and year -over-year revenue growth. then Pratt & Whitney would like to hear from you.

To become a Manufacture's representitive for the SHOCK-system ash removal system please forward your corporate line card and a cover letter explaining your successes and challenges for the last 7-10 years to our corporate office.